10d) to the system of HWS heating ČSN 06 0320 Heating systems in buildings – Hot water preparation – Designing and planning ČSN 06 0830 Heating
11Tab. no. 6 Grade of reaction to fire Grade of reaction to fire Examples of building materials and products included in the reaction to fire (E
122.4 Delivery and accessories Boiler is delivered according to the purchase order on the pallet, where the whole boiler drum is placed and on
13Mounting of covers 1. To take out the covers from the cardboard wrapping. 1 Left side cover part with insulation (3 pcs of connecting spind
142. To fit sheet components with due connecting material according to Fig. no. 6. Connecting spindle 10 pcs Spring clip 10 pcs Screw ST
15 Fig. no. 7 The boiler sheathing 4. To equip the side part with connecting spindles and pivots. 5. To mount on the anchor bolts the side cov
16To insert the keeper pin and to fit the washer 10,5 into the partition of the smoke extension piece. To mount the pull rod on the partition of t
172.6 Boiler commissioning This boiler can only be commissioned by a professional assembly firm authorized to do this activity. 2.6.1 Verific
18Usage The two way safety vent DBV 1 – 02 is used as a protection of heating boilers against overheating. In the valve body there is the bl
19vent it is necessary to check, if the 3/4“ socket usage, which can be both in pipeline and on boiler, ensures complete immersion of the ther
Table of contents page 1. Technical information ...
203. Manual for operation 3.1 Boiler operation by user SOFT COAL The most suitable fuel is sort coal with 20 – 40 mm granularity. Burning tim
2110. When the fuel starts burning well, stoke another fuel up to the lower edge of the stoking door. During stoking the fuel, do not fill the sho
223.2 Boiler cleaning - maintenance 1. Ash from ash pan and small ash pan has to be removed in the boiler operation even several times a day ac
23 Fig. no. 15 Dismantling of the cleaning covering 3.3 IMPORTANT NOTICE 1. The boiler only can be used for the purpose that it is destined f
24we recommend to operate the boiler at the temperature of 60 C and higher. Possible corrosion marks on boiler drum don´t mean a defect and they
255. Guarantee and the liability for defects VIADRUS a.s. provides the guarantee: – For boilers 24 months after the boiler putting into operati
26Information for customer Packaging identification PE Plastic sacks, folie, corrugated board, iron and plastic fix line Assessment reference I
27Annex to the guarantee certificate for customer- the user Record of accomplished guarantee and post-guarantee repairs and regular product check
VIADRUS HERCULES U 24VIADRUS a.s.Bezručova 300 | 735 81 Bohumíntelefon: 596 083 050 | fax: 596 082 822mail: [email protected] | www.viadrus.cz
3 Dear customer, we thank you that you have bought VIADRUS HERCULES U 24 universal boiler, thus having shown your confidence in VIADRUS a.s. For
4 1.3 Boiler technical data Tab. no. 1 Dimensions, technical data Number of sections pc 3 4 5 6 7 8 9 10 Boiler class according to EN 303 -
5 Tab. no. 3 Technical parameters – hard coal as fuel granularity 20 – 40 mm, fuel moisture max. 15 % Calorific value of fuel: 26 - 29 MJ.kg-1
6 1.4 Basic boiler dimensions 3 4 5 6 7 8 9 10 L mm 714 825 936 1047 1158 1269 1380 1491 L1 mm 480 591 702 813 924 1035 1146
7 1 Front cell 2 Center cell 3 Rear cell 4 Feeding gate (with the rosette of primary air) 5 Partition of combustion space 6 Cleaning cove
8 Fig. no. 3a) The location of partitions of the combustion chamber Fig. no. 4 Supplement of main boiler parts for sizes 8 – 10 cells
9 2. Assembly manual 2.1 Boiler construction The main boiler part is the cast-iron sectional boiler drum made of the grey cast-ir